Shark 100B Especificaciones Pagina 37

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 114
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 36
e
Electro Industries/GaugeTech
Doc #: E145701 4-3
4.3:
CT
Leads
Pass
Through
(No
Meter
Termination)
Q
The second method allows the CT wires to pass through the CT Inputs without terminating at the
meter. In this case, remove the Current Gills and place the CT wire directly through the CT opening.
The opening will accomodate up to 0.177” / 4.5mm maximum diameter CT wire.
Current Gills
removed
CT Wire passing through meter
Figure 4.2: Pass-Through Wire Electrical Connection
Vista de pagina 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 113 114

Comentarios a estos manuales

Sin comentarios